08-13-2024, 10:54 AM | #2 | |
Major General
4118
Rep 5,649
Posts |
Quote:
000 Order is cancelled [Order deleted by NA] 017 Order registered without quota - dummy model (master data not released); not confirmed and not scheduled [Order not specified] 027 Order registered without quota - outside the ordering time window; not confirmed and not scheduled 037 Order registered without quota - technical approval is missing; not confirmed and not scheduled [Order at BMW NA][Model or feature unavailable] 047 Order registered without quota - no quota in the entire planning period; not confirmed and not scheduled [Order bank request entered] 057 Order booked with quota - technical approval is missing; not yet confirmed and not scheduled [Spec. not released - available quota] 087 Order booked with quota - sales release is missing (e.g. for large customers); not yet confirmed and not scheduled [Order not released for production] 097 Order booked with quota - transfer to the central system is not carried out online; not yet confirmed and not scheduled [Transmission to AG - confirmation pending] 102 Order booked with quota - transferred to the central system; Special request not yet confirmed and not scheduled [Special request order received - AG] 105 Order booked with quota - transferred to the central system; not yet confirmed due to capacity limits and not scheduled [No production week available] 111 Order booked with quota - transferred to the central system; capacity checked production date is confirmed [Order Received] 112 Order for daily package planning (production) provided [Scheduled for Production] 150 Planning of bodyshell / display of chassis number and F2 date [Production begins/Production started] [Shell = "Body in White"] 151 Receipt of shell / review and, if necessary, correction of F2 date [Exterior body assembly begins/Entry body shop-serial # assign] 152 Receipt of paint shop / review and, if necessary, correction of F2 appointment [In the paint booth/Entry paint shop] 153 Receipt of assembly / review and, if necessary, correction of F2 appointment [Entering Assembly Line/Entry assembly] 154 Final assembly / inspection and, if necessary, correction of the F2 date [Assembly in progress/Assembly] 155 End of assembly (F1) and final inspection / review and, if necessary, correction of F2 date [Quality Check, Production completed, Final Assembly/Assembly finish-quality check] 160 Vehicle handover from the factory to sales / determination of F2 date (actual) / initiation of invoice and registration document creation transit [Released to Distribution, Ready For Transport/Vehicle handover to sales] 165 Factory exit and transit [In transit - Plant of Manufacture to Port of Departure] 168 BMW Group factory warehouse [AG Stock] 170 Vehicle intended for workshop cycle (BMW Welt car pick-up / retrofitting / direct sales + vehicle fleet/waiting for workshop)[Vehicle planned for workshop] 172 Vehicle scheduled for workshop run (Workshop planned) 174 Vehicle in the workshop run (Workshop entry) 176 Exit workshop - vehicle is ready (Workshop Complete) 180 Waiting For Export Dispatch [Vehicle awaiting release of consign.] 181 Handover to shipping (at foreign plant: port of destination) / vehicle is in the central brokerage warehouse) [Handover to Distribution/Dispatched from factory, Waiting for Domestic Dispatch] 182 Handover to freight forwarder - vehicle is loaded (Schedule for Carrier) [Handover to Carrier/Load Assignment] 190 Vehicle has left the factory (at the foreign plant: transshipment warehouse) / exit from the central brokerage center (In transit to port of exit) [Dispatched from AG] 191 Goods receipt BMW Group (retrieval of an already delivered vehicle with corresponding invoice credit, returned to BMW AG)[Returned to AG] 193 Entrance to the forwarding warehouse (car) [Arrived at Port of exit] 194 Selected for Shipment 195 Exit warehouse (car) (Shipped from Port of Exit) [In transit] 196 Shipment Arrival 198 Entrance to the dealer warehouse [At the Dealership] 199 Delivery to BMW Welt for self-collectors / direct sales / fleet entrance [Handover to Customer in Munich] 295 Approval of demonstration and fleet vehicles (note the bonus-relevant registration deadlines) 298 Registration or delivery notification by retailers to end customers (note the relevant registration deadlines) The 4 digit system 1100 Scheduled 1200 Scheduled for Production 5000 Confirmed for Production 5050 Chassis Number Allocated 5055 Confirmed by Production Control 5100 Bodyshop Start 5190 Bodyshop Complete 5200 Paintshop Start 5260/5270 Paintshop Complete 5300 Pre-Assembly Start 5400 Assembly Start 5500 Assembly Complete 6000 Transfer to Distribution 8200 Released to Carrier 9000 Departed Plant 9605 Pre EU port of exit. 9610/20/30/40/50/60 In Transit 9615/35/45 In Storage 9620 At sea 9630 Port of Entry 9650 Awaiting Dispatch to Dealer 9660 Dispatched to BMW Dealership 9800 Arrived Dealer |
|
Appreciate
2
bouchy149.50 my_beemmer21.00 |
08-13-2024, 01:46 PM | #3 | |
Enlisted Member
15
Rep 72
Posts |
Quote:
|
|
Appreciate
0
|
Post Reply |
Bookmarks |
Thread Tools | Search this Thread |
|
|